Filters
Question type

Study Flashcards

Explain an advantage of surveying the current system when preparing a systems analysis for a new systems project.

Correct Answer

verifed

verified

An analysis of the current system will i...

View Answer

During the detailed feasibility study of the project, the systems professional who proposed the project should be involved in performing the study.

A) True
B) False

Correct Answer

verifed

verified

Explain how application version numbers can be used as an audit to0l for assessing program change controls.

Correct Answer

verifed

verified

The SPLMS assigns a version number autom...

View Answer

A disadvantage of surveying the current system is


A) it constrains the generation of ideas about the new system
B) it highlights elements of the current system that are worth preserving
C) it pinpoints the causes of the current problems
D) all of the above are advantages of surveying the current system

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Which is not a level of a data flow diagram?


A) conceptual level
B) context level
C) intermediate level
D) elementary level

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

Which statement is correct?


A) compiled programs are very susceptible to unauthorized modification
B) the source program library stores application programs in source code form
C) modifications are made to programs in machine code language
D) the source program library management system increases operating efficiency

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

List three advantages and one disadvantage of commercial software.

Correct Answer

verifed

verified

Advantages include very quick implementa...

View Answer

Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities

A) True
B) False

Correct Answer

verifed

verified

Site preparation costs include all of the following except


A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor

E) B) and C)
F) A) and C)

Correct Answer

verifed

verified

What are two purposes of the systems project proposal?

Correct Answer

verifed

verified

First, it summarizes the findings of the...

View Answer

Aspects of project feasibility include all of the following except


A) technical feasibility
B) economic feasibility
C) logistic feasibility
D) schedule feasibility

E) None of the above
F) All of the above

Correct Answer

verifed

verified

The role of the steering committee includes


A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.

A) True
B) False

Correct Answer

verifed

verified

What is a systems selection report?

Correct Answer

verifed

verified

A systems selection report is a formal d...

View Answer

Showing 81 - 94 of 94

Related Exams

Show Answer